9. Waste Dumps step

Waste dump names and capacities are automatically detected from the Reserve Database steps (in blue). Tables marked as "Holds Dumps" in the Create Tables step will automatically list their contents.

To add point dumps:

  1. Go to Haul Infinity > Designer tab:

    1. Find or create a LiftEntry called "Dumps/DP1".

  2. Go to the Setup tab and proceed to Waste Dumps step.

    1. Hit the green plus button

    2. Rename the dump to "DP1".

    3. Assign a capacity of 1,000,000,000 cubic metres.

These Haul Infinity nodes will now be treated as point dumps by the scheduler.

Point dumps must be represented by a node in Haul Infinity. See Quick Start Tutorial. The node name must follow the convention Dumps/myDumpName.