Refresh All

On the Drillhole tab, in the Database group: Select Refresh All to run a macro to update one or more Drillhole Databases so that the trace can be regenerated to reflect changes to the source (Collar/Survey or Trench) files.

To refresh all of the Drillhole Databases in the current project:

  1. Select the Update all drillhole database files check box.
  1. Alternatively, use the ellipsis buttons to navigate to and select the Files to Update.
  2. The option to Sort one or more of the associated database files by Hole and From/Depth is provided.
  3. By default, the process will also update the underlying database links. If you prefer not to download linked data, deselect the Update database links check box.
  4. Click the Refresh button to refresh, and optionally update, the databases you have selected.

To update links to ODBC Link and MDB Link databases, use the Link options on the File tab, in the Data File group.

Forms

Click the Forms button to select and open a saved form set, or if a form set has been loaded, save the current form set.

Run

Finally, click Run to run the process.