On the Mining tab, in the Scheduling group:
-
Click New to create a new schedule. If a Schedule is already open, this option is available on the Scheduling | Schedule tab, in the Schedule group.
-
Click Open to open a schedule. If a Schedule is already open, this option is available on the Scheduling | Schedule tab, in the Schedule group.
-
Click Rename to rename a schedule. If a Schedule is already open, this option is available on the Scheduling | Schedule tab, in the Schedule group.
-
Click Delete to delete one or more existing schedules from the current project. If a Schedule is already open, this option is available on the Scheduling | Schedule tab, in the Schedule group.
-
Click Import Package to import a schedule that has previously been exported using the Export Package option.
If a Schedule is already open, this option is available on the Scheduling | Schedule tab, in the Schedule group. Select Open | Import Package.
-
Click Export Package to export the database, task wireframes and configuration files for a schedule to a single (.mmschedulere) file that can be transferred between different projects, workstations and sitesIf a Schedule is already open, this option is available on the Scheduling | Schedule tab, in the Schedule group. Select Save As | Export Package.