Introduction

-
Key Concepts
-
Tasks and Classifications
-
Attributes, Types and Groups
-
-
Scheduling Workflow
-
Schedule Definition
-
Optimisation
-
Outputs

-
Scheduling for Mining
-
Tasks
-
Dependencies
-
Type of Schedule
-
Operational (with calendars and resources)
-
Strategic (optimise, without calendars and resources)
-
-
Contextual Tabs and Views
-
Task Wireframes (Vizex)
-
Gantt Chart
-
-
Optimisation
-
Objective
-
Constraints
-
Solver
-
-
Report Data Sources
Open-Pit & Underground Mine Scheduling
Scheduling for Mining
-
Allocate time and resources (equipment, facilities and personnel) to complete a series of tasks (drill, blast, dig … material), subject to:
-
Completion of prerequisites (material acted upon beforehand)
-
àdependencies
-
-
Constraints on aggregated values of task properties
-
e.g. mass of waste mined in period, average grade of gold in ore …
-
-
Optimisation of key performance indicator
-
Maximum or minimum
-
e.g. mass of material moved, revenue earned …
-
-
Operational Scheduling
Allocate time and resources (equipment, facilities and personnel) to complete a series of tasks (drill, blast, dig … material), subject to:
Completion of prerequisites (material acted upon beforehand)
àdependencies
Constraints on aggregated values of task properties
e.g. mass of waste mined in period, average grade of gold in ore …
Modelled as “targets” and highlighted when exceeded
Strategic Scheduling
Allocate time to complete a series of tasks (drill, blast, dig … material), subject to:
Completion of prerequisites (material acted upon beforehand)
àdependencies
Constraints on aggregated values of task properties
e.g. mass of waste mined in period, average grade of gold in ore …
Optimisation of key performance indicator
Maximum or minimum
e.g. mass of material moved, revenue earned …
Introduction (Top)
Tasks
Separate pieces of work (jobs) to be completed
Definition
List of attributes (properties)
e.g. volume, density, grade, …
Wireframe (solid) specifies location and 3D spatial extent
Imported from wireframes
Wireframe attributes mapped to task attributes
Additional attributes for tasks calculated using expressions
e.g. based on design parameters
Classifications for Tasks
Task Types
Sets of tasks with common characteristics (e.g. attribute derivations and default rates)
Schedule | Task Types | Manage
Task Categories
Sets of tasks assigned to user-defined categories
Schedule | Task Types | Categories | Manage
Task Groups
Sets of tasks defined by filters and/or expressions
Schedule | Add Tasks | Inter-Group Dependencies
Introduction (Top)
Scheduling Workflow Outline
Operational or Strategic
Units of Measurement
Task Attributes
Define Task Types
Add Tasks
Set Dependencies
Visual Checks
Run Diagnostics
Strategic: Optimise
Animate
Report
Python Scripting
Introduction (Top)
Open-Pit & Underground Mine Scheduling
Blending from single or multiple pits/mines
Production targets
Grade targets
Stripping ratios
Constraints on periods
Constraints across multiple periods
Refer to Open Pit Mine Scheduling Workflows for workflow options.