Development Networks

On the Task Sources tab of the Schedule Definition form, specify the sources from which the tasks of the schedule will be generated.

When you select Development Networks as a Task Source, the Scheduler requires you to load and decode a network of centreline strings as a design profile that can be used to indicate the directions in which development advances and show the dependencies required to access the primary tasks in a schedule.

A Солиды выработки tool separate to the Scheduler is also available on вкладке Горные работы, в группе Подготовка задач.

Name

Optionally, specify the name of the wireframe set.

Code

Specify a code for the extruded wireframes. The code is used to build names for fields in report data sources and attributes for the saved wireframes.

Definition

Нажмите на кнопку Формы, чтобы загрузить определение, сохраненное ранее в виде набора форм. Чтобы отредактировать определение, щелкните правой кнопкой мыши и выберите Правка или нажмите на F4. Чтобы создать определение, щелкните правой кнопкой и выберите Создать.

Источники задач