Что нового

Здесь описаны новые функции и усовершенствования в Micromine Origin & Beyond 2025.5 (версия 25.5).

Основные моменты релиза

Компания Micromine рада представить вам новейшую версию своего ведущего программного решения для геологоразведки и проектирования рудников Micromine Origin & Beyond 2025.5. Релиз 2025.5 содержит множество новых функций, улучшений и усовершенствований, которые подробно описаны в этом документе.

Общие

  • The Merge Georeferenced Images tool has been added on вкладке Файл, в группе Изображение to merge multiple georeferenced images to create a new output image.

  • Many forms can now be used as Templates and are clearly marked throughout the application. Template Forms are used to inherit saved or previously used values.

  • Align view to section has been added to the Geolink Vizex Window options to allow the alignment of Overview window parallel to sections.

  • Grade Tonnage reports (Block Model, Interval, 3D Points) can now output Tonnage values. Additionally, the Grade Tonnage (Block Model) report can also output void tonnage values.

  • Descriptive Stats now shows more statistics, a histogram or cumulative frequency plot and upper and lower unique values.

  • Nexus-related macro commands have been added to вкладке Скриптинг, в группе Команды макросов to upload, download and revert files, as well as check for updates and synchronise the Nexus project.

     

Origin

    • The Import Drillholes form has been added to the File | Import tool to import external collar, survey, interval and event data to create a new drillhole database.

    • The Distance to Drillhole tool has been added to enable you to model the spacing and distances between drillholes in a database.

    • The Extend to DTM and Extend Beyond Target options have been added to the Drillhole Planning | Drillhole From Collar tool to extend a drillhole to a target wireframe.

    • The Create Drillhole Database and Create Trench Database forms have been redesigned to enable all DAT files to be selected at once. Collar, survey, interval and event files will be detected and the key fields will automatically populate the form.

    • The Load Vein Intercepts tool has been added to the Vein tool to allow editing of vein intercepts used in Vein modelling.

    • The Constrain to Pit tool has been added to provide a simple interface to run Pit Optimisation in the Resource Estimation Module to assess Reasonable Prospects for Eventual Economic Extraction (RPEEE) or investigate maximum infill drilling depths targeting open pit resources.

    • The Dendrogram tool has been added to display and interactively investigate the results of HDBScan and Hierarchical Agglomerative clustering methods.

       

  • Beyond

    • Variable Constraints in Pit Design allow you to apply variable constraints to specific string segments, customise slot ramp calculations and segments directly in the design layer, and designate internal pit limits with automated contouring around “no-go zones”.

    • The Fan Details have been added to the Properties pane in Edit Fan mode. When a fan is selected, the Fan Details are available for editing directly in the pane.

    • The workflow for Pit Optimisation and Stope Optimisation is now simpler and has been improved by reducing the depth of the nested form sets. Settings are now more transparent and more easily navigated via the left-hand pane in the Optimisation Setup form.

    • Using the Task Sources tab in the Schedule Definition form, you can now generate tasks from a Pit Optimisation form set. The Pit Optimisations task source will create annotated task solids and do reserving onto the wireframes from the block model specified in the form set.