Processing Facilities
Use the Processing Facilities tab to specify the list of available processing facilities, along with the following settings for each processing facility.
(This option is disabled when Setup > Model > Optimisation Criteria > Optimisation Value: Use value from field or Use head grade is selected.)
Name
Enter the name of the processing facility for which the parameters are specified.
Code
Enter the identification code to be assigned to the processing facility for which the parameters are specified.
Processing cost
Enter the cost per unit mass or volume of processing material by the facility.
Processing cost units
Select the units to which the Processing cost is referenced.
General and administration cost
Enter the general and administration (G&A) cost incurred per unit mass or volume when processing material by the facility.
General and administration cost units
Select the units to which the General and administration cost is referenced.
Material Processing
Добываемую горную массу можно отправлять в бинах материала на перерабатывающие предприятия и в склады. При расчете значения оптимизации для блока будут использоваться средства переработки, которые дают наиболее прибыльный результат по блоку, на основании бина материала, которому он присвоен. See: Material Bin Processing