How charges and volumes are calculated
The terms used in the calculations shown in this topic are defined in the table below.
| 
                                                         Terms:  | 
                                                |
|---|---|
| TD | Total drill depth | 
| Inclination | Hole inclination (-90 = vertically down) | 
| SD | Subdrill | 
| H | Bench height (a vertical height) | 
| B | Burden | 
| S | Spacing | 
| D | Hole diameter | 
| CD | Charge density (grams per cubic centimetre) | 
| PF | Powder factor | 
| SL | Stemming length | 
| CL | Charge length | 
TD = SL + CL
H = Cos(Inclination) x TD – SD
Volume of rock per hole = B x S x H (cubic metres)
Charge (weight) per hole = PF x B x S x H (Kg)
Charge per hole = (PF x B x S x H) / (1000 x CD) (cubic metres)
Hole volume (per metre) = (3.14159 x D x D) / 4000000 (cubic metres)
CL = (PF x B x S x H x 4000) / (3.14159 x D x D x CD)