Schedule (Animation)
The Output Schedule is opened by default whenever you open a Scenario. The Output Schedule is the line-by-line representation of every single result you can get out of your Source & Destination Scheduling, as well as various (but not all) Haulage results.
On the Home tab, in the Results group, you can switch between the Schedule and the Animation.
When a Scenario is open, note that the tools and options available for selection on the Home tab, in the Setup group, will depend on the simulations enabled for that case.