P4: Operator Timesheet

P4: Operator Timesheets

Description:
The time, location, duration and many other details of the activities of an operator during a particular time frame are presented in chronological order. The timesheet is a summary of the changes and measures over the defined period and may extend over more than a page. After checking the details of the timesheet, each employee can sign his or her sheet as a true record of the work undertaken for the period.
Associated panels:
P3: Operator Timeline The time started, the location, the duration and many other details of the activities of an operator are presented in chronological order for the defined time frame. The timeline details every change made over the time period affecting the operator and may extend over more than a page. After checking the details of the timeline, each employee may sign his or her sheet as a true record of the work undertaken for the period.
PA5: Equipment Performance by Location – Destination For each piece of selected equipment the operating time, the measure and the rate are listed for each source-destination combination. The total operating, idle and down times, and the availability, utilisation and U of A for each piece of equipment are listed. The overall totals for the whole period are also included.
PA6: Equipment Performance by Operator The information on this panel is first sorted by operator. For each of the selected operators-equipment combination the operating, idle and down times, and the availability, utilisation and U of A for the defined period are listed. The total measure and its production rate (measure per operating hour) for the period also are included. The overall totals for the whole period are presented.
Terms used:
Duration A period of elapsed time: a time interval.
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Operator All Operators, Crew, Team, Operator.
Summary levels:
The final report will include data at the Period and Status Attribute levels.
Data capture method:
Paper log Voice radio Automated network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production