PA5: Equipment Performance by Location – Destination
PA5: Equipment Performance by Location - Destination
Description: |
---|
For each piece of selected equipment the operating time, the measure and the rate are listed for each source-destination combination. The total operating, idle and down times, and the availability, utilisation and U of A for each piece of equipment are listed. The overall totals for the whole period are also included. |
Associated panels: | |
---|---|
G1: Equipment Availability and Utilisation | This panel presents a line graph of the average availability and utilisation of the selected equipment for the defined period. The U of A is also included. It could be used in a Dashboard or to display U o f A trends in weekly and monthly meetings. |
G2: Equipment Hours (Percentage Pie Graph) | The panel presents a pie graph of the selected status of the selected equipment as a percentage of the total. The individual percentage of each state is listed. |
EH1: Equipment Hours | A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine. |
Terms used: | |
Availability | (Operating + Idle / Operating + Idle + Down) * 100 |
U of A Utilisation of Availability |
(Operating / (Operating + Idle)) * 100 |
Utilisation | (Operating / (Operating + Idle + Down)) * 100 |
Rate | Measure per unit time. For example, tonnes per operating hour – measure/ operating hours. |
Panel Definition: | |
A panel is defined by a set of report parameters and attributes which may vary from site to site: | |
Parameter | Attributes |
Site | Select from the list of configured sites. |
Period | Year, Month, Day Shift, Macro. |
Equipment | The unit of equipment assigned as Secondary Unit. |
Crew | All Crew, Crew. |
Measure | Select from the list of available values. |
Summary levels: |
---|
The panel will report information to the selected Period, Equipment, Source and Destination Attribute levels. |
Data capture method: | ||
---|---|---|
Paper log | Voice radio | Automated network |
Target audience: | ||||
---|---|---|---|---|
Management | Engineering | Geology | Survey | Maintenance |
Personnel | Control Room Operator | Contractors | Drilling | Production |