EH1: Equipment Hours

EH1: Equipment Hours

Description:
A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine.
Associated panels:
CA3: Current Sign Register A summary of the time selected equipment spent in selected states for a defined period.
CA3: Current Sign Register A summary of the time selected equipment spent in selected states for a defined period.
  A comprehensive report on the date, start time and duration of selected equipment. The equipment status at the time, the measure type and its value are all reported for the defined period.
Terms used:
OID One or all of the operating, idle and down states.
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Crew

All Crew, Crew.

Status

All States, Group, Type, Category, Detail.

Summary levels:
The panel will report information to the selected Equipment and Status Attribute levels.
Data capture method:
Paper log Voice radio Automated network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production