G2: Equipment Hours (Percentage Pie Graph)

G2: Equipment Hours (Percentage Pie Graph)

Description:
The panel presents a pie graph of the selected status of the selected equipment as a percentage of the total. The individual percentage of each state is listed.

It provides the ability to graphically display U of A data and could be used in a Dashboard or to display U of A trends in weekly and monthly meetings.

Associated panels:
PA3: Equipment Performance This panel is similar to the Equipment Hours (Percentage Pie Graph) panel. The pie graph and the itemised list of states in this panel are the actual time the selected equipment spent in the state during the defined period.
PA1: Equipment Availability This panel presents a summary of the total number of workers recorded operating in the system for the defined period.
PA3: Equipment Performance This is a comprehensive report on the status of the selected equipment over the defined period. The total measure and its production rate (measure per operating hour), and the availability, utilisation and UofA of the equipment are included. The overall totals for the whole period are presented.
Terms used:
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Status All States, Group, Type, Category, Detail.
Panel Definition:
A panel is defined by a set of report parameters and attributes which may vary from site to site:
Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Source All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location.
Destination All Material, Minelevel, Orebody, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Dump.
Operator All Operators, Crew, Team, Operator.
Measure Select from the list of available values.
FilterMeasure Select from the list of available values.
Summary levels:
The final report will include data at the Period Attribute Level.
Data capture method:
Paper log Voice Radio Automated Network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production