PA3: Equipment Performance
Description: |
---|
This is a comprehensive report on the status of the selected equipment over the defined period. The total measure and its production rate (measure per operating hour), and the availability, utilisation and UofA of the equipment are included. The overall totals for the whole period are presented. |
Associated panels: | |
---|---|
G1: Equipment Availability and Utilisation | This panel presents a line graph of the average availability and utilisation of the selected equipment for the defined period. The U of A is also included. It could be used in a Dashboard or to display U o f A trends in weekly and monthly meetings. |
G2: Equipment Hours (Percentage Pie Graph) | The panel presents a pie graph of the selected status of the selected equipment as a percentage of the total. The individual percentage of each state is listed. |
EH1: Equipment Hours | A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine. |
Terms used: | |
Availability | (Operating + Idle / Operating + Idle + Down) * 100 |
U of A Utilisation of Availability |
(Operating / (Operating + Idle)) * 100 |
Utilisation | (Operating / (Operating + Idle + Down)) * 100 |
Rate | Measure per unit time. For example, tonnes per operating hour – measure/ operating hours. |
Panel Definition: | |
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
Parameter | Attributes |
Site | Select from the list of configured sites. |
Period | Year, Month, Day Shift, Macro. |
Equipment | The unit of equipment assigned as Secondary Unit. |
Roster Crew | All Crews, Crew. |
Measure | Select from the list of measures. |
Summary levels: |
---|
The panel will report information to the selected Period and Equipment Attribute levels. |
Data capture method: | ||
---|---|---|
Paper log | Voice radio | Automated network |
Target audience: | ||||
---|---|---|---|---|
Management | Engineering | Geology | Survey | Maintenance |
Personnel | Control Room Operator | Contractors | Drilling | Production |