G3: Equipment Hours (Pie Graph)

G3: Equipment Hours (Pie Graph)

Description:
This panel is similar to the Equipment Hours (Percentage Pie Graph) panel. The pie graph and the itemised list of states in this panel are the actual time the selected equipment spent in the state during the defined period.
It provides the ability to graphically display U of A data and could be used in a Dashboard or to display U of A trends in weekly and monthly meetings..
Associated panels:
G2: Equipment Hours (Percentage Pie Graph) The panel presents a pie graph of the selected status of the selected equipment as a percentage of the total. The individual percentage of each state is listed.
PA1: Equipment Availability The time that selected equipment spent in Operating, Idle and Down states during the defined period is reported. From these states the percentage figures of equipment availability, utilisation and U of A are calculated and reported.
PA3: Equipment Performance This is a comprehensive report on the status of the selected equipment over the defined period. The total measure and its production rate (measure per operating hour), and the availability, utilisation and UofA of the equipment are included. The overall totals for the whole period are presented.
Terms used:  
Availability (Operating + Idle / Operating + Idle + Down) * 100

U of A

Utilisation of Availability

(Operating / (Operating + Idle)) * 100
Utilisation (Operating / (Operating + Idle + Down)) * 100
Panel Definition:
A panel is defined by a set of report parameters and attributes which may vary from site to site:
Parameter Attributes
Site

Select from the list of configured sites.

Period

Year, Month, Day Shift, Macro.

Equipment The unit of equipment assigned as Secondary Unit.
Status All States, Group, Type, Category, Detail.
S
Summary Levels
The final report will include data at the Period Attribute Level.
Data Capture Method:
Paper log Voice Radio Automated Network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production