EH6: Equipment Timeline With Measures

EH6: Equipment Timeline With Measures

Description:
A comprehensive report on the date, start time and duration of selected equipment. The equipment status at the time, the measure type and its value are all reported for the defined period.
This panel is most useful for data validation – if there is reason to suspect that activities have been entered incorrectly, this may assist Administrators or Control Room Operators in identifying and resolving the problem.
Associated panels:
EH3: Equipment Hours by Period A summary of the time selected equipment spent in selected states for a defined period.
EH7: Meantime Between Failures The total down hours of the selected machinery for the defined period is reported. A count of the number of failures, the mean time between failures and the mean time for repair during the period are included.
EH8: Mean Time Between Failures Graph The results are presented as histograms of the Number of Maintenance Events and Time to Repair. It is an analysis of the frequency selected equipment is in maintenance, and of the time taken to repair.
Terms used:
Mean Time Between Failures The mean operating time between the equipment downtime. Reported as the value of MTBF.
Panel Definition:
A panel is defined by a set of report parameters and attributes which may vary from site to site:
Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Source All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location.
Destination All Material, Minelevel, Orebody, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Dump.
Status

All States, Group, Type, Category, Detail.

Measure

Select from the list of measures.

Summary levels:
Level selection is not available for this panel.
Data capture method:
Paper log Voice Radio Automated Network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production