EH3: Equipment Hours by Period

EH3: Equipment Hours by Period

Description:
A summary of the time selected equipment spent in selected states for a defined period.

Short-range planners can use this panel with short periods (e.g. each shift for a week) to compare each vehicle’s activities against their plans.

Associated panels:
EH1: Equipment Hours A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine.
EH3: Equipment Hours by Period A summary of the time selected equipment spent in selected states for a defined period.
EH5: Equipment Timeline A comprehensive report on the date, start time and duration that selected equipment was in one of the selected states during the defined period.
Terms used:
OID One or all of the operating, idle and down states.
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Crew All Crew, Crew.
Status All States, Group, Type, Category, Detail.
Summary levels:

The final report will include data at the Attribute level for the following Parameters:

Period, Equipment and Status.
Data capture method:
Paper log Voice radio Automated network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production