EH4: Equipment Hours by Status Group (OID)

EH4: Equipment Hours by Status Group (OID)

Description:
A summary of the hours spent in the selected operating, idle or down states for each of the selected equipment-crew groups for the defined period.

Grouping equipment by function, over a long period of time (e.g. month), will allow supervisors, managers and planners to better understand how operators of each type of vehicle spend their work day.

Associated panels:
EH1: Equipment Hours A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine.
EH3: Equipment Hours by Period

Short-range planners can use this panel with short periods (e.g. each shift for a week) to compare each vehicle’s activities against their plans.

EH5: Equipment Timeline A comprehensive report on the date, start time and duration that selected equipment was in one of the selected states during the defined period.
Terms used:
OID One or all of the operating, idle and down states.
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Crew

All Crew, Crew.

Status

All States, Group, Type, Category, Detail.

Summary levels:
The final report will include data at the attribute level for the following parameters: Equipment and Status.
Data capture method:
Paper log Voice Automated
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production