EH4: Equipment Hours by Status Group (OID)
EH4: Equipment Hours by Status Group (OID)
| Description: |
|---|
| A summary of the hours spent in the selected operating, idle or down states for each of the selected equipment-crew groups for the defined period. |
|
Grouping equipment by function, over a long period of time (e.g. month), will allow supervisors, managers and planners to better understand how operators of each type of vehicle spend their work day. |
| Associated panels: | |
|---|---|
| EH1: Equipment Hours | A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine. |
| EH3: Equipment Hours by Period |
Short-range planners can use this panel with short periods (e.g. each shift for a week) to compare each vehicle’s activities against their plans. |
| EH5: Equipment Timeline | A comprehensive report on the date, start time and duration that selected equipment was in one of the selected states during the defined period. |
| Terms used: | |
| OID | One or all of the operating, idle and down states. |
| Panel Definition: | |
|
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
| Parameter | Attributes |
| Site | Select from the list of configured sites. |
| Period | Year, Month, Day Shift, Macro. |
| Equipment | The unit of equipment assigned as Secondary Unit. |
| Crew |
All Crew, Crew. |
| Status |
All States, Group, Type, Category, Detail. |
| Summary levels: |
|---|
| The final report will include data at the attribute level for the following parameters: Equipment and Status. |
| Data capture method: | ||
|---|---|---|
| Paper log | Voice | Automated |
| Target audience: | ||||
|---|---|---|---|---|
| Management | Engineering | Geology | Survey | Maintenance |
| Personnel | Control Room Operator | Contractors | Drilling | Production |