Development Networks
On the Task Sources tab of the Schedule Definition form, specify the sources from which the tasks of the schedule will be generated.
When you select Development Networks as a Task Source, the Scheduler requires you to load and decode a network of centreline strings as a design profile that can be used to indicate the directions in which development advances and show the dependencies required to access the primary tasks in a schedule.
A Development Solids tool separate to the Scheduler is also available on the Mining tab, in the Task Preparation group.
Name
Optionally, specify the name of the wireframe set.
Code
Specify a code for the extruded wireframes. The code is used to build names for fields in report data sources and attributes for the saved wireframes.
Definition
Click the Forms button to load a definition that was previously saved as a form set. To edit a definition, right-click and select Edit or press F4. To create a definition, right-click and select New.