P6: Personnel Hours (Primary Operators)
|
For each piece of the selected equipment the operator and hours spent operating the equipment are listed for the defined period. The overall total for each operator and the overall total for each piece of equipment are included. |
P2: Hours by Period
|
This panel reports the operators of the selected equipment and the time spent in that capacity during the defined period. The total time for the period for each operator and overall time spent by all the operators are included. |
PA3: Equipment Performance
|
This is a comprehensive report on the status of the selected equipment over the defined period. The total measure and its production rate (measure per operating hour), and the availability, utilisation and UofA of the equipment are included. The overall totals for the whole period are presented. |
All Personnel |
All personnel included both primary operators and trainees. |
Primary operator |
Each piece of equipment must have an operator. This is the primary operator. Trainee operators may accompany the primary operator. |
A panel is defined by a set of report parameters and attributes which may vary from site to site:
|
Site |
Select from the list of configured sites. |
Period |
Year, Month, Day Shift, Macro. |
Equipment |
The unit of equipment assigned as Secondary Unit. |
Operator |
All Operators, Crew, Team, Operator. |