P2: Hours by Period

P2: Hours by Period

Description:
This panel reports the operators of the selected equipment and the time spent in that capacity during the defined period. The total time for the period for each operator and overall time spent by all the operators are included.
Associated panels:
P3: Operator Timeline The time started, the location, the duration and many other details of the activities of an operator are presented in chronological order for the defined time frame. The timeline details every change made over the time period affecting the operator and may extend over more than a page. After checking the details of the timeline, each employee may sign his or her sheet as a true record of the work undertaken for the period.
P5: Personnel Hours (All Personnel) For each piece of selected equipment the operator, the operator’s role and the duration in that role are reported for the defined period.
Terms used:
Duration A period of elapsed time: a time interval.
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Summary levels:
The panel will report information to the selected Period Attribute levels.
Data capture method:
Paper log Voice radio Automated
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production