EH9: Equipment Location Timeline
EH9: Equipment Location Timeline
Description: |
---|
This panel lists equipment and the locations they have visited over the report period, in the order that the locations were visited with the associated durations. |
Associated panels: | |
---|---|
EH5: Equipment Timeline | A comprehensive report on the date, start time and duration that selected equipment was in one of the selected states during the defined period. |
EH6: Equipment Timeline With Measures | A comprehensive report on the date, start time and duration of selected equipment. The equipment status at the time, the measure type and its value are all reported for the defined period. |
Terms used: | |
N/A | |
Panel Definition: | |
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
Parameter | Attributes |
Site | Select from the list of configured sites. |
Period | Year, Month, Day Shift, Macro. |
Equipment | The unit of equipment assigned as Secondary Unit. |
Source | All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location. |
Shift Boss | Select from the list of allocated shift bosses. |
Shift Roster |
Select from the list of user defined shift rosters. |
Summary levels: |
---|
Level selection is not available for this panel. |
Data capture method: | ||
---|---|---|
Paper log | Voice radio | Automated network |
Target audience: | ||||
---|---|---|---|---|
Management | Engineering | Geology | Survey | Maintenance |
Personnel | Control Room Operator | Contractors | Drilling | Production |