EH11: Operator Equipment Hours

EH11: Operator Equipment Hours

Description:
Displays the hours spent in each status by equipment units with Operators over a given period.
Associated panels:
EH1: Equipment Hours A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine.
EH2: Equipment Hours Pareto This report displays the selected states of the selected equipment for a defined period in two ways: as a histogram with each measured characteristic shown in descending order of magnitude, and as a line which is the cumulative total of hours by status at each point.
CA3: Current Sign Register A summary of the time selected equipment spent in selected states for a defined period.
Terms used:
N/A  
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Crew

All Crew, Crew.

Status

All States, Group, Type, Category, Detail.

Operator All Operators, Crew, Team, Operator.
Shift Roster Select from the list of user defined shift rosters.
Summary levels:
Level selection is not available for this panel.
Data capture method:
Paper log Voice radio Automated network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production