CY8: Truck Cycle Duration
|
A comprehensive report of the start cycle time for the selected hauling equipment active during the defined period. Included for each truck is the time spent at each stage of the hauling cycle, the duration of the cycle and the tonnage hauled. |
CY7: Truck Cycles (Actual Tonnage)
|
This panel lists the cycle start times for the selected trucks that were active during the defined period. The tonnage hauled on each loader-location-destination cycle and the total tonnage hauled by the truck for the period are included. If other reports show that a truck has unusually high cycle times, this panel can be used to get a detailed understanding of that truck’s cycles and material movements. |
CY1: Average Load Times
|
This panel reports the average load time, the average queuing time, the average payload and the number of loads made by the loading equipment at selected source locations for a defined period. It is a review of loader performance. Use this panel to group by year or month, and look for trends in average loading times and tonnages, and compare operators or crews to look for below-average performance or identify training opportunities.
|
Haulage Cycle |
The truck journey between source, destination, and return. The cycle incorporates the following stages: queuing, loading, hauling and travelling empty. |
A panel is defined by a set of report parameters and attributes which may vary from site to site:
|
Site |
Select from the list of configured sites. |
Period |
Year, Month, Day Shift, Macro. |
Source |
All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location.
|
Operator |
All Operators, Crew, Team, Operator. |