CY8: Truck Cycle Duration

CY8: Truck Cycle Duration

Description:
A comprehensive report of the start cycle time for the selected hauling equipment active during the defined period. Included for each truck is the time spent at each stage of the hauling cycle, the duration of the cycle and the tonnage hauled.
This panel can be used in conjunction with an equipment status report to provide a complete understanding of a truck’s activity over the course of a day.
Associated panels:
CY9: Truck Cycles Duration Graph The truck cycles states are displayed as a histogram for the selected equipment that was active during the selected period. This display makes it very easy to observe the performance of a truck over the period, and to compare the performance between trucks.
CY10: Truck Cycles by Loader This panel lists the loading activity for selected loaders that were active during the defined period. This includes the time of the load, the haul truck loaded, the location of the loader and the destination of the material.
CY7: Truck Cycles (Actual Tonnage) This panel lists the cycle start times for the selected trucks that were active during the defined period. The tonnage hauled on each loader-location-destination cycle and the total tonnage hauled by the truck for the period are included. If other reports show that a truck has unusually high cycle times, this panel can be used to get a detailed understanding of that truck’s cycles and material movements.
Terms used:
Hauling Cycle The truck journey between source, destination, and return. The cycle incorporates the following stages: queuing, loading, hauling and travelling empty.
Panel Definition:

A panel is defined by a set of report parameters and attributes which may vary from site to site:

Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Hauling The unit of equipment assigned as Secondary Unit.
Summary levels:
The final report will include data at the selected Hauling Attribute level.
Data capture method:
Paper log Voice radio Automated network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production