Dump Sequences

Dump Sequences allows users to create and manage dump fill order. These sequences can be used in destination rules rather than selecting the individual dumps.

This can make managing dumps easier as users can make changes to the sequence and those changes will automatically be applied to the destination rules.

Dump sequences are applied using the same priority logic as destination rules:

  • Waste Rules are order dependent and listed in priority:

    • All destination inputs on the same row will have the same priority and material will be sent to the Destination with the Shortest Cycle Time that is available (in the Constrain on Trucks mode).

    • For Destinations on multiple rows, the higher rows have priority. When all the available Destinations on a row are exhausted, the optimiser will cascade to the next row to find a next available Destination.

    • Availability will be judged by Capacity, open haul route (Dynamic Haulage rules) and Constraints operating on that Destination.


Dump Sequences Setup


Destination Rules using Dump Sequence