View
When the Output Schedule or the Animation Window is open, the following options are available for selection on the Home tab and the Design tab, in the View group:
- 
                                                
Select Reset View to reset the view to the default layout, edit the current layout or save the current layout.
                                                 
- 
                                                
Select Plan View to reset the view to PLAN view.
                                                 
- 
                                                
Select Zoom to Data Extents to zoom to the extents of the currently loaded design data.
                                                 
- 
                                                
Select Reload Solids to reload animation solids from the database. This is required to update the animation when the solids have been modified.
                                                 
- 
                                                
Select Hide Solids to choose how your Source and Destination solids are shown in the Animation window.
                                                 
- 
                                                
When a Haulage Network Layer is loaded, click to Hide/Show Haul Profiles in the animation window.
                                                 
- 
                                                
Select Animation Options to ajust the increment and speed of the animation. You can also choose to show the source/destination line and which properties of the haul profile to show in the animation.
                                                 
- 
                                                
Select Solid Colours to create the colour sets that can be applied to Source and/or Destination solids in the Animation.
                                                 
- 
                                                
When the Output Schedule is open, select Schedule Grid Layout to set the layout of the grid in the Output Schedule Window.
                                                 
For more information, see: