P5: Personnel Hours (All Personnel)
|
For each piece of selected equipment the operator, the operator’s role and the duration in that role are reported for the defined period. |
P6: Personnel Hours (Primary Operators)
|
For each piece of the selected equipment the operator and hours spent operating the equipment are listed for the defined period. The overall total for each operator and the overall total for each piece of equipment are included. |
A panel is defined by a set of report parameters and attributes which may vary from site to site:
|
Site |
Select from the list of configured sites. |
Period |
Year, Month, Day Shift, Macro. |
Shift Boss |
Select from the list of allocated shift bosses. |
Operator |
All Operators, Crew, Team, Operator. |
Source |
All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location. |
Shift Roster |
Select from the list of user defined shift rosters. |