MN5: Repair States
| Description: |
|---|
| This report details the repair status for equipment and the duration for which the status has applied. |
| Associated panels: | |
|---|---|
| MN4: Prestart Checklist | This report shows passed and failed prestart checklist items identified by period, equipment, checklist category and prestart time. |
| Terms used: | |
| N/A | |
| Panel Definition: | |
|
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
| Parameter | Attributes |
| Site | Select from the list of configured sites. |
| Period | Year, Month, Day Shift, Macro. |
| Equipment |
The unit of equipment assigned as Secondary Unit. |
| Operator | All Operators, Crew, Team, Operator. |
| Shift Roster |
Select from the list of user defined shift rosters. |
| Summary levels: |
|---|
| Level selection is not available for this panel. |
| Data capture method: | ||
|---|---|---|
| Paper log | Voice radio | Automated network |
| Target audience: | ||||
|---|---|---|---|---|
| Management | Engineering | Geology | Survey | Maintenance |
| Personnel | Control Room Operator | Contractors | Drilling | Production |