MN4: Prestart Checklist
Description: |
---|
This report shows passed and failed prestart checklist items identified by period, equipment, checklist category and prestart time. |
Associated panels: | |
---|---|
MN5: Repair States | This report details the repair status for equipment and the duration for which the status has applied. |
Terms used: | |
N/A | |
Panel Definition: | |
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
Parameter | Attributes |
Site | Select from the list of configured sites. |
Period | Year, Month, Day Shift, Macro. |
Shift Boss |
Select from the list of allocated shift bosses. |
Source | All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location. |
Shift Roster |
Select from the list of user defined shift rosters. |
Summary levels: |
---|
Level selection is not available for this panel. |
Data capture method: | ||
---|---|---|
Paper log | Voice radio | Automated network |
Target audience: | ||||
---|---|---|---|---|
Management | Engineering | Geology | Survey | Maintenance |
Personnel | Control Room Operator | Contractors | Drilling | Production |