MM4: Equipment Measures by Location - Destination

MM4: Equipment Measures by Location - Destination

Description:
The panel presents the total amount of material moved from a source to a destination during the period for each of the pieces of selected equipment. The measure type, the material, the source and the destination are all selected and reported. The total measures for each piece of equipment for the period are included.
Associated panels:
GC2: Daily Production The tonnage of material moved from a selected source to a selected destination during the defined period is reported. The defined grade types of the material are presented as grades and contained metal values. As there may be numerous grade types defined, each row may cover more than one page.
MM2: Equipment Measures Material measures recorded against selected items of equipment over a defined period. Overall total measures are included in the report, for example, the metres advanced by production drills, the litres of fuel used by dozers, or the metres sprayed by shotcreters.
MM13: Material Movements The amount of material moved from one of the selected sources to one of the selected destinations during the defined period. The total material moved during the period for each source-destination group and the overall total are included.
Terms used:
TruckDump The total number of truck material dumps made during a period.
Panel Definition:
A panel is defined by a set of report parameters and attributes which may vary from site to site:
Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Source All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location.
Material Type, Category, Group.
Measure Select from the list of available values.
Summary levels:
The final report will include data at the attribute level for the following parameters: Equipment, Source, and Destination.
Data capture method:
Paper log Voice Automated
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production