MM21: Location Measures Timelines

MM21: Location Measures Timeline

Description:
A timeline of measures recorded against locations over a defined period. Overall total measures for each location are included in the report.
Associated panels:
MM20: Location Measures Material measures recorded against selected locations over a defined period. Overall total measures are included in the report, for example, the metres advanced at a site, litres of fuel used by equipment for the site, or the metres sprayed by shotcreters on location.
MM13: Material Movements The amount of material moved from one of the selected sources to one of the selected destinations during the defined period. The total material moved during the period for each source-destination group and the overall total are included.
Terms used:
Measure The measure selected for the Location Measure Timeline report.
Panel Definition:
A panel is defined by a set of report parameters and attributes which may vary from site to site:
Parameter Attributes
Site Select from the list of configured sites.
Period Year, Month, Day Shift, Macro.
Shift Boss Select from the list of allocated shift bosses.
Source All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location.
Measure Select from the list of available values.
Shift Roster Select from the list of user defined shift rosters.
Summary levels:
Level selection is not available for this panel.
Data capture method:
Paper log Voice Automated
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production