MM2: Equipment Measures
|
Material measures recorded against selected items of equipment over a defined period. Overall total measures are included in the report, for example, the metres advanced by production drills, the litres of fuel used by dozers, or the metres sprayed by shotcreters. |
MM13: Material Movements
|
The amount of material moved from one of the selected sources to one of the selected destinations during the defined period. The total material moved during the period for each source-destination group and the overall total are included. |
Measure |
The measure selected for the Location Measure report. |
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
Site |
Select from the list of configured sites. |
Period |
Year, Month, Day Shift, Macro. |
Shift Boss |
Select from the list of allocated shift bosses. |
Source |
All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location. |
Measure |
Select from the list of available values. |
Shift Roster |
Select from the list of user defined shift rosters. |