CA5: Sign Timeline
|
This panel lists information on the signs that have been created. Use this panel to report on controlled area signs. |
Sign |
A sign is used to define a restricted access area. Often these are areas where a level of danger exists, for example, where there is limited oxygen, potential for a rock fall, or exposed electrics. |
Permit |
A permit is an authority for a person or people to enter an area. The area may or may not be signed. For example, a permit may be issued to an electrician to repair a switch on the East30 drive, or be issued to a health and safety officer to inspect the new crib room on the 1000 level, or be issued to a welder to stabilise a structure inside the mill. |
Snooze |
If workers exceed the defined exit time for the controlled area, an alarm is raised. Granting the workers an extension of time enables a snooze mode for the sign or permit. An alarm is again sounded when the extended time is exceeded. |
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
Site |
Select from the list of configured sites. |
Period |
Year, Month, Day Shift, Macro. |