Configuration

In the Drill and Blast | Configuration screen, you can choose which columns to include in the design grid and setup preconditions or rules that determine when material movements onto a stockpile can be triggered.

Some columns are mandatory while other columns are optional and will typically contain data which is only used for reporting. The order and naming of the columns will vary from site to site and are fully configurable.

Deploying Reference Data

Loading and Editing a Configuration