Schedule tab

The Schedule tab is the main work area of the Alastri Tactical Scheduler software. The scheduling functionality provided here is unique and allows the user to work with it in many different ways.


Schedule tab overview

The Schedule tab comprises several important work areas: a Scenarios Panel as well as several auxiliary tabs, each of which has its own functionality. For more information, click on the following links or use the table-of-contents (left) to navigate between the sub-topics.

  • Scenarios Panel

  • The Scenarios Panel is located at the top of the Schedule tab. Here you can manage scenarios and toggle between them.

  • Calendar tab

  • The Calendar tab is a calendar plan for open pit mining, arranged by production periods, mine components, equipment used, and applicable constraints and parameters.

  • Animation tab

  • The Animation tab provides the user with a graphical representation of the activities performed by periods, as well as the ability to select data to display and set priority incentives.

  • Trace tab

  • The Trace Report (Schedule tab > Trace tab) records decisions made when an Agent evaluates a source block. This provides a useful tool for users to understand why a block was mined (or not) at a particular point in time.

  • Reporting tab

  • The Reporting tab is displayed within the context of a given project and enables you to generate any standard or custom report currently available for the project. You can generate a single report or generate multiple different reports simultaneously for the project. Once the generation of a report has completed, you may export and download the report in all its available formats.