Known Mining Parcels

The Setup Task > Reserve Database > Data Fields > Known Mining Parcels step is optional and is used to add additional material types to Tactical Scheduler that may not be present in the reserves inventory. This may include legacy materials on the stockpiles or known material types that are predicted to be present in future iterations of the schedule.

Note that Known Mining Parcels is only included as a Data Fields step if the Specify Known Parcels flag is enabled in the Configuration Options step.


Known Mining Parcels Setup step

This step ensures that the parcel filters on Destination Logic, Steps Logic, Constraints and Product Specifications do not have to be updated every time there is a change in the reserves.

If using Parcel Subsets, adding new Known Mining Parcels or renaming existing ones, will result in “Unassigned” parcels in the Mutex Parcel Groups.

When editing Known Mining Parcels, review the Mutex Parcel Subsets specified in Setup > Reserve Database > Parcel Subsets and rename the “Unassigned” parcel to match the parcel name.