OP2: Material Movements by Time
OP2: Material Movements by Time
| Description: |
|---|
| This panel displays the first and last movement performed by selected equipment during a shift over a selected period. |
| Associated panels: | |
|---|---|
| MM13: Material Movements | A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine. |
| Panel Definition: | |
|
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
| Parameter | Attributes |
| Site | Select from the list of configured sites. |
| Period | Year, Month, Day Shift, Macro. |
| Shift Boss | Select from the list of allocated shift bosses. |
| Equipment | The unit of equipment assigned as Secondary Unit. |
| Shift Roster | Select from the list of user defined shift rosters. |
| Summary levels: |
|---|
| Level selection is not available for this panel. |
| Data capture method: | ||
|---|---|---|
| Paper log | Voice radio | Automated network |
| Target audience: | ||||
|---|---|---|---|---|
| Management | Engineering | Geology | Survey | Maintenance |
| Personnel | Control Room Operator | Contractors | Drilling | Production |