CU1: Adhoc Report

CU1: Adhoc Report

Description:
This panel details measure events with associated equipment, location, destination, operator, material and period.
Associated panels:
CU2: Secondary to Primary Unit Report This panel displays secondary equipment and the units to which they are allocated.
Terms used:
Period Year, Month, Day Shift, Macro.
Equipment The unit of equipment assigned as Secondary Unit.
Status All States, Group, Type, Category, Detail.
Panel Definition:
A panel is defined by a set of report parameters and attributes which may vary from site to site:
Parameter Attributes
Site Select from the list of configured sites.
Equipment The unit of equipment assigned as Secondary Unit.
Material Type, Category, Group.
Measure Select from the list of available values.
Operator All Operators, Crew, Team, Operator.
Period Year, Month, Day Shift, Macro.
Source All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location.
Destination All Material, Minelevel, Orebody, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Dump.
Shift Boss Select from the list of allocated shift bosses.
Status All States, Group, Type, Category, Detail.
Shift Roster Select from the list of user defined shift rosters.
Summary levels:
Level selection is not available for this panel.
Data capture method:
Paper log Voice Radio Automated Network
Target audience:
Management Engineering Geology Survey Maintenance
Personnel Control Room Operator Contractors Drilling Production