Reporting
A number of shift plan reports are supported by the Reporting service in the Pitram Portal:
Operator plan
The Operator plan identifies the tasks that operators have been assigned to.
Equipment plan
The Equipment plan identifies the tasks that equipment units have been assigned to.
Location plan
The Location plan identifies the locations that have been scheduled for tasks.
Plan variance
The Plan Variance report shows the times allocated to the tasks in the plan against the times taken to complete them.