Resource Optimisation
This
Create Bench Pushbacks
On the Mining tab, in the Resource Optimisation group, you can now select Pit Optimiser | Create Bench Pushbacks to generate bench solids that satisfy minimum mining widths directly from pit optimisation results
This option is also available on вкладке Горные работы, в группе Подготовка задач.
Mine Setup
While setting up an optimisation (pit or stope) and the interpretation of the Recovery/Losses value on the Model > Dilution and Recovery tab of the setup form is RECOVERY, the default unit is now PERCENT (since this is the most common scenario).