Export Drill Plan
The Data Transfer component of the Configuration Manager contains tools used to import and export data for Micromine Geobank.
The Export Drill Plan option exports all planned holes, including surveys, DH surveys, and planned samples for a selected Project and Location as a .csv file. The export also populates GM tables with the planned holes and samples.
To export the drill plan,
-
Open the Configuration Manager.
-
Select the Data Transfer| Exports | GM Exports option.
-
Double click the Export Drill Plan option.
The Property Editor: Export form opens.
The General tab contains the Name and Description of the export tool.
Execute Before Open Event(s) on starting Export/Import
An export/import may require some sort of data 'setup' prior to the export with possibly a 'teardown' once the export/import has completed. This is usually achieved by configuring BeforeOpen and AfterClose SQL Events (for example, to create and populate a temporary table and then remove the temporary table after the export/import).
Select the Execute Before Open Event(s)... check box to change the sequence of events for the Import/Export. This will delay the execution of the process until the Before Open Event is executed. If the checkbox is not selected, the process will run immediately and the Before Open Event will occur after. After Open Events will always occur after the Export/Import process.
If you are configuring a task in Unattended mode, be aware that you should use the full UNC path for any mapped network drive: for example, \\server001\data\reports\ instead of N:\Reports. For detailed information, see Automation.