Record Subsets

The Setup Task > Database > Record Subsets setup step allows users to create groups which contain specific sources and/or destinations in a single place.

Record subsets can be referenced in the Dump Sequences, Destination Rules, Truck Assignments, and Flow Optimisation steps of the project. Using Record Subsets makes it easy to update a definition in many places at once.

Record Subsets may include groups of blocks based on:

  • Fleet: Autonomous or Crewed

  • Certain mining RL: Below or Above water level, Lower or Higher benches

  • Source blocks for the specific destination

  • Source blocks for the specific phases, or of a certain volume

  • Blocks to be mined/drilled within specific periods, etc.


Example Record Subsets

To add a Record Subset:

  1. Click the Plus icon to add a new subset.

  2. To add phases/benches/blocks in the subset:

    • Flag them in the Included Records list

To edit a subset graphically:

  1. Select a subset from the Subset list.

  2. Click the Edit Subset Graphically button.

  3. Using the Viewport and/or the Records tree, select blocks to add/remove from the subset.

  4. In the Viewport, right click on the block and choose an option required to Replace/Append/Remove items in the Subset:


    Edit Record Subsets graphically