Record Subsets
The Setup Task > Database > Record Subsets setup step allows users to create groups which contain specific sources and/or destinations in a single place.
Record subsets can be referenced in the Dump Sequences, Destination Rules, Truck Assignments, and Flow Optimisation steps of the project. Using Record Subsets makes it easy to update a definition in many places at once.
Record Subsets may include groups of blocks based on:
-
Fleet: Autonomous or Crewed
-
Certain mining RL: Below or Above water level, Lower or Higher benches
-
Source blocks for the specific destination
-
Source blocks for the specific phases, or of a certain volume
-
Blocks to be mined/drilled within specific periods, etc.
Example Record Subsets
To add a Record Subset:
-
Click the
Plus icon to add a new subset.
-
To add phases/benches/blocks in the subset:
-
Flag them in the Included Records list
To edit a subset graphically:
-
Select a subset from the Subset list.
-
Click the Edit Subset Graphically button.
-
Using the Viewport and/or the Records tree, select blocks to add/remove from the subset.
-
In the Viewport, right click on the block and choose an option required to Replace/Append/Remove items in the Subset:
Edit Record Subsets graphically